Frist abgelaufen

20251127

Teilnahmefrist
16.01.26, 11:00 Uhr
Auftraggeber
Trianel Windkraftwerk Borkum II GmbH & Co. KG
Ort
Oldenburg, Niedersachsen
Veröffentlicht
14.12.2025
Laufzeit
2 Jahre
Verfahren
Verhandlungsverfahren mit Teilnahmewettbewerb

Originalunterlagen ↗

Leistungsbeschreibung

The tender covers the replacement and disposal of hydraulic hoses on 32 offshore crane systems (16 units per year), as well as optional services related to oil maintenance/replacement and the procurement of materials required for these activities. In addition, and optionally the assessment, planning, and execution of local repair activities for selected components on offshore crane and transition piece structures, in connection with the scope of work defined in SOW1, is planned. Furthermore, a technical evaluation and the development of potential repair methods and long-term maintenance concept is included.

Eignungsanforderungen

  • see tender documents (participation application document)

Zuschlag / Ergebnis

Ein verifizierbares Zuschlagsergebnis liegt uns noch nicht vor.

Ähnliche offene Ausschreibungen

Archivierte Bekanntmachung. Maßgeblich sind die Originalbekanntmachung und Vergabeunterlagen.